Source: https://nishanth-fern-test.docs-staging.pageloop.ai/desktop/scheduling-an-integration

# Scheduling an Integration

Once you have integrated an application with Whatfix (for example, [Confluence Integration](/desktop/confluence-integration)), you can schedule it to run automatically at a specific interval of time so that any data changes that you have to post the integration are also factored in.

#### Benefits of scheduling an Integration

- Reduces manual intervention.
- Increases transparency on data movement.

#### Schedule an Integration

Use the following steps to schedule an integration:

1. On the Whatfix Guidance dashboard, click **Settings**. ![ia\_left\_nav\_settings](/images/b8/ia_left_nav_settings-b868cdaa.png)

2. Click **App integrations**. ![ia\_left nav\_app integrations](/images/6a/ia_left-nav_app-integrations-6aeb712e.png)

3. On the **All Integrations** page, Go to the Integration you want to schedule and make sure the Integration is in an **Active** state. ![RB\_dashboard\_int\_active\_toggle](/images/93/RB_dashboard_int_active_toggle-93be6d6b.png)

4. Click **Schedule Run**. ![schedule\_run](/images/15/schedule_run-15762a22.png)

5. The following are the options that you can configure,

- **Start On** - Set the start date and time period.
- **Time zone** - Specify the time zone from the dropdown for the specified dates to follow.
- **Repeat** - Configure the frequency of the Integration run during the selected time period.
- **Ends** -
  1. Select the **Never** option if you want the Integration to run forever. (or)
  2. Select the **On** option and then specify the end date and time period. ![RB\_dashboard\_int\_popup](/images/89/RB_dashboard_int_popup-899f19ec.png)

4. Click **Save**.

> [!INFO]
>
> - Only Integrations in an active state can be scheduled.
> - A webhook based integration (for example, [SurveyMonkey Integration](/desktop/surveymonkey-integration) cannot be scheduled.

The following are a few use cases:

**Push a Flow as slideshow/article to Confluence and Zendesk - Monthly**

In the Schedule integration run pop-up:

1. Set the start date and time period.
2. In the **Repeat** section, select **Once a month**. ![RB\_dashboard\_int\_monthly](/images/51/RB_dashboard_int_monthly-518014cd.png)
3. Set the end date and then click **Save**.

**Push Whatfix analytics data to a BI tool - Weekly**

In the Schedule integration run pop-up:

1. Set the start date and time period.
2. In the **Repeat** section, select **Once a week**. ![RB\_dashboard\_int\_once\_a\_week](/images/a9/RB_dashboard_int_once_a_week-a9e00c35.png)
3. Set the end date and then click **Save**.

**Pull Role information from Salesforce and Successfactor - Weekly**

In the Schedule integration run pop-up,

1. Set the start date and time period.
2. In the **Repeat** section, select **Once a week**. ![RB\_dashboard\_int\_once\_a\_week](/images/a9/RB_dashboard_int_once_a_week-a9e00c35.png)
3. In the Ends section, select the **Never** option and then click **Save**.
