Source: https://nishanth-fern-test.docs-staging.pageloop.ai/analytics/how-can-you-edit-a-reporting-schedule-in-product-analytics

# How can you edit a reporting schedule in Product Analytics?

Whatfix enables you to edit a reporting schedule after creating it. Edit an existing reporting schedule when it expires or to add or remove a recipient.

Make the following changes to an existing schedule:

- Update the name of the schedule
- Add or remove recipients
- Change the scheduling condition

> [!WARNING]
>
> Currently, Whatfix enables you to schedule only Trend Insight reports.

Use the following steps to edit a reporting schedule:

1. On the [Whatfix Analytics dashboard](/analytics/how-can-i-access-the-product-analytics-dashboard), click **Insights**.

![pa\_click\_insights\_left\_pane.png](/images/8a/pa_click_insights_left_pane-8a8a32a5.png)

1. Click the Trend Insight for which you want to edit the schedule.

![trend\_insight\_select\_insight\_to\_schedule\_listing.png](/images/4a/trend_insight_select_insight_to_schedule_listing-4ae5a126.png)
2\. Click **Schedule**.

![ei\_click\_schedule](/images/b2/ei_click_schedule-b2ce556d.png)
3\. Click the existing Schedule.

![click\_existing\_schedule](/images/93/click_existing_schedule-93394692.png)
4\. Make the necessary changes. For more information, see [Schedule a Trend Insight](/analytics/schedule-a-trend-insight).
5\. Click **Save schedule**.

![ei\_save\_schedule](/images/7f/ei_save_schedule-7f2f7c3f.png)

> [!INFO]
>
> - The schedule gets updated, and the reports are sent according to the updated Schedule.
> - Once the schedule is saved, it becomes active by default and is denoted by the **Active** label. The reports are sent from the time the schedule becomes active.
>
> ![active\_report\_schedule](/images/10/active_report_schedule-1020dd58.png)
